National Road Jiayin to Linjiang Highway (G222) Jingyu to Jiangyuan Section Construction Project
Cost Advisory Second Tender Notice
1. Bidding conditions
The construction project of the national highway Jiayin to Linjiang Road (G222) Jingyu to Jiangyuan section has been approved by the Jilin Provincial Development and Reform Commission with the document (Jilfa Reform Approval [2017] 180). The project owner and the bidder are Baishan. City Transportation Development Investment Co., Ltd. and Jingyu County Hengyuan Traffic Construction Investment Co., Ltd., the construction funds are self-raised by the provincial government and the local government. The project has already met the conditions for bidding. The project price consultation is now open for public bidding.
2. Project overview and scope of tender
2.1 Construction Scale and Technical Standards: The starting point of this project is at the intersection of Jialin Line and National Road Fusong to Gongzhuling Highway (G504), bypassing Jingyu County on the west side of Jingyu County, passing through Baoan Village, Luming Village and Jingyu Village ( Xintun), Yingmendingzi, Lixin Village, Xibeiyan, City Wall Street, and the end point are connected to the National Crane Line. The total length of the project is 48.3 kilometers, of which, 27.876 kilometers in Jingyu County and 20.424 kilometers in Jiangyuan District. The secondary road standard with a design speed of 60 km/h has a width of 16m for the wide starting point section (11.5km) and the terminal section (8.9km), and the rest of the section is 8.5m. The overall course of the route is northeast to southwest. The asphalt concrete structure is used for the pavement. There are 344m/4 blocks of Dazhong Bridge (including 106m/1 block), 64m/bridge of blocks (newly built), and 103 culverts (of which 10 are used for lengthening, 79 new roads are removed, and 14 are newly built). , Separate three-dimensional intersection 7 (new 398 meters / 2, 5 places), plane crossing, drainage engineering, protective engineering and so on.
The main project scales are as follows:
Mileage Length (Km) Major Project Scale Remarks
48.3 27.876 106m/1 Dazhong Bridge, 32m/1 bridge, 52 culverts (including 6 long culverts), 5 detachable three-dimensional intersections (including 398m/2 new sites, using 3 sites) , drainage protection works. Jingyu County
20.424 Set 238m/3 blocks of Dazhong Bridge (including 132m/2 blocks, 106m/1 block), bridge 32m/1, 51 culverts (4 of them are used for lengthening), separate three-dimensional crossover 2 (use), drainage protection works, etc. Jiangyuan District
A total of bids are set for this project, namely the JLZJ bid section.
2.2 Bidding scope: Project design budget review, bid checklist and list budget review, project final verification (intervention during the request process), and other work that should be completed during final audit of this project.
2.3 Service cycle: From the effective date of the contract to the end of the completion acceptance certificate.
3. Bidder qualification requirements
3.1 Qualification requirements: This tender requires bidders to have independent legal person qualifications, and have the Grade A qualification of an effective engineering cost consulting company issued by the construction administrative department.
3.2 Performance requirements: Completion of at least one single contract (pre-calculated) Grade 2 or above (including Level 2) project finalized project audited project with a total investment of no less than RMB 400 million (compensed after January 1, 2012) The nature of the project should be the reconstruction, expansion, or new construction. The maintenance project cannot be used as the corporate project performance of this tender.)
3.3 The Commonwealth does not accept bids from the Commonwealth.
3.4 The person in charge who is the same person or who has a controlling or management relationship may not participate in the tender for the same tender, otherwise the relevant tender will be invalid.
3.5 Based on the provisions of the “Notice on Conducting Enquiries on the Files of Bribery Crimes in the Field of Engineering Construction†(CCS [2015] No. 5), the bidders’ units and individuals (referring to the legal representatives and project managers to be invested) Consultant's representative) Inquiring about bribery crime files (The date of the inquiry results should be the same as or after the date of purchase of the bidding documents for this project. The minimum time limit must be checked from January 1, 2014 to December 13, 2017.) In the bidding document. Bidders (including units or individuals) who commit crimes of bribery upon enquiry will not be able to pass the eligibility review for this project (no inquiry or pass).
4. Evaluation methods
This project adopts a comprehensive evaluation method (double envelope form) to evaluate the bids, and conducts qualification examination on bidders after qualification.
5. Acquisition of bidding documents
5.1 Any bidder interested in participating in the bid is requested from December 13th, 2017 to December 19th, 2017 (excluding legal holidays, statutory holidays), daily from 8:30am to 16:00pm (Beijing time, the same ),