The Bidding Project Nanshui Reservoir Water Supply Project of Ruyuan Yao Autonomous County of Shaoguan City has been approved by the Guangdong Development and Reform Commission with the document No. 2495 of Yuefa Agricultural Economic Letters [2015] No. 2495. The Development and Reform Bureau of Shaoguan City has issued a plan for the development of the industry [2016] ] Document No. 7 approved the preliminary design report and construction funds were in place. The bidder was the Nanshui Reservoir Water Supply Project Management Bureau of Ruyuan Yao Autonomous County. The project has already met the conditions for bidding. The project is now undergoing open bidding.

2. Project overview and scope of tender
The Nanshui Reservoir Water Supply Project of Ruyuan Yao Autonomous County of Shaoguan City is located in Shaoguan City, northern Guangdong Province. The mission of the project is to supply water. The water resources of the Nanshui Reservoir will be brought to Ruyuan County and Shaoguan City through water pipelines to provide the county and The living and industrial waters of the eastern ethnic minority and limestone area towns and Shaoguan urban areas. The recent construction project will have a total length of about 37.95km. The long-term construction of a branch of milk source water and water distribution pipeline will be approximately 36.95km long. The projects are classified as II, etc. The main building level is 2 and the secondary building level is 3. The total construction period is 24 months. The preliminary design approval of the project's total investment estimate is 1,034,430,900 yuan. The bids for the construction of the civil works installation and the water conservation and environmental protection project construction were set up in five tenders.
Section I: Slot 0+000~6+100, the project budget is 102.352 million yuan;
Section II: Stake 6+100~14+000, the project budget is 92,025,700 yuan;
Section III: Stake 14+000~22+000, with a budget of 84.7022 million yuan;
Section IV: Stake No. 22+000~30+100, with a project budget of 91.1735 million yuan;
Section V: Stake 30+100~37+948. The project budget is 73.9174 million yuan.
3. Bidder qualification requirements
The tender requires the bidder to meet the following qualification conditions, meet credit requirements, and have the ability to undertake the construction of the project in terms of personnel, equipment, and funds.
3.1. The bidder shall have at least Grade 1 (including Class 1) general contracting for construction of water conservancy and hydropower projects and Grade 1 (including Class 1) qualification for general contracting for construction of municipal public works and receive the “Integrity Manual for the Subject of Water Conservancy Construction Market of Shaoguan City” and Handle the registration of integrity in the Shaoguan City Housing and Urban-Rural Development Bureau.
3.2. Has a valid business license, has an effective safety production license, and has an effective qualification certificate.
3.3. The main management personnel planned to invest in the project must be the integrity manual for the water conservancy construction market in Shaoguan City, or the member of the Chengguan City Housing and Urban-Rural Development Bureau's credibility registration form, and “the five largest members” (construction worker, safety officer, material officer, and information worker). (Quality inspectors) are fully equipped with at least 2 construction workers and full-time safety staff.
3.4 The person in charge of the technology to be invested in the project must have a senior professional title of water conservancy and hydropower.
3.5 The project manager to be invested must be a water conservancy and hydropower project professional level or a municipal public utility professional construction division and registered in this unit, and obtain the safety production assessment certificate issued by the competent administrative department.
3.6 Credit requirements: The bidder is not being ordered to suspend business, the bid qualification is cancelled, the property is taken over, frozen, and bankruptcy.
3.7 The bidder must have gone through IC card procedures in Guangzhou.
3.8 According to the "Letter on Implementation" (Zhongchaofa [2013] No. 96), the applicant company, legal representative participating in the bid for this project, the chief engineer planning to be appointed as the chief engineer of the project, and the authorized client must obtain the enterprise. The letter of inquiries from the People's Procuratorate on the results of investigations into the files of bribery crimes was issued in the past three years without records of bribery crimes at the location or location of the project. The bidder shall put the original letter of the notice in the original bidding document.
3.9. The legal representative of the bidder and the authorized principal (if any) must attend the bid opening meeting and present their second-generation ID verification on the spot.
3.10. The Commonwealth does not accept bids from the Commonwealth. The order of bid opening and bid evaluation is: Section I → Section II → Section III → Section IV → Section V. Each bidder can sign up for five bids at the same time if they meet the eligibility requirements, but only one bid is offered. In the process of bid evaluation in the first paragraph, after a bidder is identified as the first successful bidder in the first bid, the bid for the bid of the second bidder of the bidder only participates in the bid evaluation of the bid, but it cannot be used as Winning candidate for the second paragraph. And so on the III section, the IV section, and the V section.
3.11 After the qualification for the tender, the specific requirements for the qualification review will be found in the bidding documents. After the qualification, the bid documents of the unqualified bidders will be disposed of.
3.12. An affiliated company that has an investment shareholding relationship, or a parent company that has a direct management and managed relationship, or a subsidiary of the same parent company, or whose legal representative is the same person, and two or more legal persons may not bid on the same project at the same time. , otherwise it will be treated as scrapped. The central enterprises under the direct supervision of the State-owned Assets Supervision and Administration Agency of the State Council do not belong to the “parent company” specified in this article, and their first-level subsidiaries may simultaneously submit bids in the same project, but the second-level subsidiaries that belong to the same subsidiary may not simultaneously perform the same project. Make a bid.
3.13. This project does not accept construction engineers who are under construction, have not been awarded bids, or have been listed as candidates for the first successful bidder of other projects as project managers. If the above circumstances are found to be confirmed, the tenderee has the right to confiscate his bid security and press Related laws and regulations are dealt with.
4. Registration and bidding documents acquisition
4.1. From December 30, 2016 to January 6, 2017, daily from 9:30 to 11:30, and from 14:00 to 16:00 (Beijing time, the same below)

166mm Mono Solar Panel

In terms of production capacity supply, although the current photovoltaic market is battling around the size of 182mm and 210mm, it has its own advantages to occupy a certain proportion of the market share.


PERC 166mm Solar Cell

with Solar Panel`s efficiency up to 21.2%

Sunket 166mm solar panel use 166mm 9BB solar cell, increases the wafer size, optimizes the layout profoundly and decreases the invalid power generation area.


1.Half Cell Technology

The half-cut cell design can decrease the power loss by the shadow effectively. The optimized circuit design not only realizes the maximum power output but also assures the reliability of solar panels.


2.MBB Technology


Sunket 166mm Solar Panel adopts 9 busbar technology. More busbars of the cell decrease the current transverse propagation path by 50%, effectively reduce the internal loss, and improve power of solar panels.


Standard & All Black Solar Panels

max power breaks through 460W+

01. 120/144Cells Solar Panels


02. All Black Solar Panel for home use


03. 360W-460W+ Solar Panel, Suitable for residential roofs


Solar Panel,Solar PV Module,166 PV Module,166mm Solar Panel,166 Solar Panel

Wuxi Sunket New Energy Technology Co.,Ltd , https://www.sunketsolar.com